
Construction and installation of the steel bridge of the Mianeh-Tabriz railway, km 53/24+153, plot 8/A
General specifications:
Total weight of the bridge: 1150 tons
Total length of the bridge: 218 meters
Installation method: Installation with a crane
Project start: November 2019
Location: East Azarbayjan, Saeed Abad village-Garmdare valley