Steel Bridge Design Guidelines – Publication 395

To download Steel Bridge Design Guidelines – Publication 395, please refer to the following link: Download
To download Steel Bridge Design Guidelines – Publication 395, please refer to the following link: Download
To download the Code of Connections in Steel Structures – Publication 264, please refer to the following link: Download
General specifications: Total weight of the bridge: 1150 tons Total length of the bridge: 218 meters Installation method: Installation with a crane Project start: November 2019 Location: East Azarbayjan, Saeed Abad village-Garmdare valley
General specifications: Total weight of the bridge: 1200 tons Total length of the bridge: 245 meters Installation method: Installation with a crane Project start: May 2019 Location: East Azarbayjan, Saeed Abad village-Saeed Abad valley
General specifications: Total bridge length: spillway bridge including 4 36-meter lines and intake tower bridge including 2 90-meter lines Total weight of metal structure: spillway bridge 40 tons and intake tower bridge 70 tons Installation method: crane installation Project start:…
General specifications: Total bridge length: 105 meters Total weight of the metal structure: 150 tons Installation method: Installation with a crane Project completion: July 2018 Location: Tehran, Modares Highway after the intersection of Africa Street Pictures in the following article
General specifications: Total length of the bridge: 12 meters Total weight of the metal structure: 30 tons Installation method: Installation with a crane Project start: March 2016 Location: Tehran, Darakeh, Arabi Street Pictures to follow
General specifications: Total length of the bridge: – Total weight of the metal structure: 180 tons Installation method: Installation with a crane Project start: November 2016 Location: Tehran, beginning of Pasdaran Street, Zarabkhaneh Bridge Pictures in the following article
General specifications: Total bridge length: 3 24-meter lines Total weight of the metal structure: 50 tons Installation method: Installation with a crane Project start: January 2015 Location: Sardasht – Sardasht Dam Pictures in the continuation of the article
General specifications: Total bridge length: 150 meters (3 arched spans) Total weight of the metal structure: 600 tons Installation method: Installation with a crane Project completion: January 2015 Location: Tehran – South Shariati Street entrance to East Hemmat Highway Pictures…