Construction and installation of Hashtgerd overpass with a span of 20+50+20, consisting of 4 box girders, 90 meters long, 2 meters wide, 2 meters high, weighing 600 tons – September 2014

General specifications: Total length of the bridge: 90 meters, with a span of 20+50+20 meters Total weight of the metal structure: 600 tons Installation method: with a crane Project started in September 2003 and completed in September 2004 Location: on…

Construction and installation of the Qazvin-Rasht-Anzali railway bridge project (km 700+101) 25 50-meter spans + 5 3-meter spans (installation of 10 spans by advancing) Bridge length 1500 meters (30 spans) weighing 3500 tons – May 2015

General specifications: Total bridge length 1500 meters with 50-meter spans Total weight of the metal structure 3000 tons Installation method: 10 advancing spans and 20 spans with crane Project start February 2017 Location: On Sepidroud Lake in Manjil city on…