Construction and installation of the South-North Modares Highway roundabout bridge after Africa Street, Tehran, weighing 150 tons and 105 meters long – July 2018

General specifications: Total bridge length: 105 meters Total weight of the metal structure: 150 tons Installation method: Installation with a crane Project completion: July 2018 Location: Tehran, Modares Highway after the intersection of Africa Street Pictures in the following article

Read MoreConstruction and installation of the South-North Modares Highway roundabout bridge after Africa Street, Tehran, weighing 150 tons and 105 meters long – July 2018

Construction and installation of Darakeh Bridge, Tehran, Arabi Street, weighing 30 tons and 12 meters long – March 2016

General specifications: Total length of the bridge: 12 meters Total weight of the metal structure: 30 tons Installation method: Installation with a crane Project start: March 2016 Location: Tehran, Darakeh, Arabi Street Pictures to follow

Read MoreConstruction and installation of Darakeh Bridge, Tehran, Arabi Street, weighing 30 tons and 12 meters long – March 2016

Construction and installation of a roundabout bridge on Hemmat Highway, Pasdaran Street, Tehran, weighing 180 tons – January 2016

General specifications: Total length of the bridge: – Total weight of the metal structure: 180 tons Installation method: Installation with a crane Project start: November 2016 Location: Tehran, beginning of Pasdaran Street, Zarabkhaneh Bridge Pictures in the following article

Read MoreConstruction and installation of a roundabout bridge on Hemmat Highway, Pasdaran Street, Tehran, weighing 180 tons – January 2016

Construction and installation of the Sardasht Dam spillway consisting of 3 24-meter lines weighing 50 tons – June 2016

General specifications: Total bridge length: 3 24-meter lines Total weight of the metal structure: 50 tons Installation method: Installation with a crane Project start: January 2015 Location: Sardasht – Sardasht Dam Pictures in the continuation of the article

Read MoreConstruction and installation of the Sardasht Dam spillway consisting of 3 24-meter lines weighing 50 tons – June 2016

Construction and installation of the Shariati Street-Hemmat Highway (Tehran) intersection bridge weighing 600 tons and 150 meters long (3 arched spans) – January 2015

General specifications: Total bridge length: 150 meters (3 arched spans) Total weight of the metal structure: 600 tons Installation method: Installation with a crane Project completion: January 2015 Location: Tehran – South Shariati Street entrance to East Hemmat Highway Pictures…

Read MoreConstruction and installation of the Shariati Street-Hemmat Highway (Tehran) intersection bridge weighing 600 tons and 150 meters long (3 arched spans) – January 2015