

Construction and installation of metal beams of the Western Beltway Veterans Bridge in Kermanshah with a span of 30+35+30, a length of 95 meters and a weight of 600 tons – February 2015
General specifications: The total length of the bridge is 95 meters with a span of 30+35+30 meters. Total weight of the metal structure: 600 tons The project started in September 2005 and was completed in February 2005. Pictures follow.