
Construction and installation of Kermanshah-Khosravi railway bridge (km 615+5) – 4 spans of 28 meters, weighing 70 tons – July 2013
General specifications:
Total bridge length: 112 meters (4 spans of 28 meters)
Total weight of metal structure: 70 tons
Installation method: Installation with crane
Project start: July 2013