Construction and installation of metal beams for the Parand Metro Bridge, km 310+43, 116 meters long and weighing 265 tons – May 2012
General specifications:
Total bridge length 116 meters with a span of 23+35+35+23 meters
Total weight of the metal structure 265 tons
Project started in May 2012
Pictures to follow