Construction and installation of metal box girders of the Qara Bridge towards Kermanshah with a span of 35+35+35 consisting of 4 beams of 105 meters

General specifications:

Total length of the bridge is 95 meters with a span of 30+35+30 meters

Total weight of the metal structure is 600 tons

Project started in September 2005 and completed in February 2005

Pictures in the continuation of the article