Construction and installation of Sarab Qanbar Bridge, Kermanshah, with a span of 30 meters and a weight of 100 tons – July 2005

General specifications:

Total length of the bridge: 30 meters

Total weight of the metal structure: 100 tons

Project started in March 2004 and completed in July 2005

Pictures follow.

Leave a Reply

Your email address will not be published. Required fields are marked *

Loading