
Construction and installation of Sarab Qanbar Bridge, Kermanshah, with a span of 30 meters and a weight of 100 tons – July 2005
General specifications:
Total length of the bridge: 30 meters
Total weight of the metal structure: 100 tons
Project started in March 2004 and completed in July 2005
Pictures follow.
