Construction and installation of the non-level bridge of the three-way axis of the end – Omidiyeh with a span of 11 + 34 + 11 meters with articulated piers weighing 350 tons – August 2008

General specifications:

Total length of the bridge is 56 meters with a span of 11 + 34 + 11 meters

Total weight of the metal structure is 350 tons

Project started in November 2009 and completed in August 2008

Pictures in the continuation of the article