Construction and installation of the roof of Darian Power Plant weighing 250 tons – September 2013

General specifications:

Total weight of the metal structure 250 tons

Project start September 2013

Location: Paveh – Darian Power Plant

Leave a Reply

Your email address will not be published. Required fields are marked *

Loading