Construction and installation of the Sardasht Dam spillway consisting of 3 24-meter lines weighing 50 tons – June 2016

General specifications:

Total bridge length: 3 24-meter lines

Total weight of the metal structure: 50 tons

Installation method: Installation with a crane

Project start: January 2015

Location: Sardasht – Sardasht Dam

Pictures in the continuation of the article