Construction and installation of the Sardasht Dam spillway consisting of 3 24-meter lines weighing 50 tons – June 2016
General specifications:
Total bridge length: 3 24-meter lines
Total weight of the metal structure: 50 tons
Installation method: Installation with a crane
Project start: January 2015
Location: Sardasht – Sardasht Dam