Construction and installation of metal beams for the Parand Metro Bridge, km 43+596, 25 meters long and weighing 60 tons – August 2012

General specifications:

Total bridge length 25 meters

Total weight of the metal structure 60 tons

Project started in April 2012 and completed in August 2012

Pictures below