Construction and installation of the Shariati Street-Hemmat Highway (Tehran) intersection bridge weighing 600 tons and 150 meters long (3 arched spans) – January 2015

General specifications:

Total bridge length: 150 meters (3 arched spans)

Total weight of the metal structure: 600 tons

Installation method: Installation with a crane

Project completion: January 2015

Location: Tehran – South Shariati Street entrance to East Hemmat Highway

Pictures in the continuation of the article