Construction and installation of the Shariati Street-Hemmat Highway (Tehran) intersection bridge weighing 600 tons and 150 meters long (3 arched spans) – January 2015
General specifications:
Total bridge length: 150 meters (3 arched spans)
Total weight of the metal structure: 600 tons
Installation method: Installation with a crane
Project completion: January 2015
Location: Tehran – South Shariati Street entrance to East Hemmat Highway