Construction and installation of the South-North Modares Highway roundabout bridge after Africa Street, Tehran, weighing 150 tons and 105 meters long – July 2018

General specifications:

Total bridge length: 105 meters

Total weight of the metal structure: 150 tons

Installation method: Installation with a crane

Project completion: July 2018

Location: Tehran, Modares Highway after the intersection of Africa Street

Pictures in the following article