Construction and installation of the steel bridge of the Mianeh-Tabriz railway, km 53/24+153, plot 8/A

General specifications:

Total weight of the bridge: 1150 tons

Total length of the bridge: 218 meters

Installation method: Installation with a crane

Project start: November 2019

Location: East Azarbayjan, Saeed Abad village-Garmdare valley

Leave a Reply

Your email address will not be published. Required fields are marked *

Loading