Construction and installation of the steel bridge of the Mianeh-Tabriz railway, km 774+153, section 8/A

General specifications:

Total weight of the bridge: 1200 tons

Total length of the bridge: 245 meters

Installation method: Installation with a crane

Project start: May 2019

Location: East Azarbayjan, Saeed Abad village-Saeed Abad valley