Construction and installation of the steel bridge of the Mianeh-Tabriz railway, km 774+153, section 8/A
General specifications:
Total weight of the bridge: 1200 tons
Total length of the bridge: 245 meters
Installation method: Installation with a crane
Project start: May 2019
Location: East Azarbayjan, Saeed Abad village-Saeed Abad valley